E2329-01 Foundation Stabilization & Waterproofing E.W. Thompson State School
The project consists of underpinning of existing strip & spread footings including excavation to bottom of footings, preparation & footings to receive underpinning and backfill. Also includes removal & replacement of exterior sidewalks & paving & interior slabs-on-grade along with the removal & replacement or reinstallation of interior floor finishes as part of the underpinning work. The interior faces of the perimeter CMU walls are to be re-pointed where cracks are present. All openings are to be re-caulked.
Specifications
(click to expand/collapse)
Name | Size | ||
01-Full Spec | 6.5 MB | ||
02-Division 00 | 2.0 MB | ||
03-Division 01 | 1.4 MB | ||
04-Division 02 | 136.1 KB | ||
05-Division 03 | 228.5 KB | ||
06-Division 04 | 123.0 KB | ||
07-Division 07 | 99.8 KB | ||
08-Division 09 | 91.7 KB | ||
09-Division 31 | 224.8 KB | ||
10-Division 32 | 85.4 KB | ||
11-Appendix 1 | 2.1 MB |