E2329-01 Foundation Stabilization & Waterproofing E.W. Thompson State School
The project consists of underpinning of existing strip & spread footings including excavation to bottom of footings, preparation & footings to receive underpinning and backfill. Also includes removal & replacement of exterior sidewalks & paving & interior slabs-on-grade along with the removal & replacement or reinstallation of interior floor finishes as part of the underpinning work. The interior faces of the perimeter CMU walls are to be re-pointed where cracks are present. All openings are to be re-caulked.
Issued for Bid
(click to expand/collapse)
Name | Size | ||
00-Full PDF of Plans | 4.4 MB | ||
01-Cover_Cover Sheet | 401.5 KB | ||
02-S-000_Site Location | 490.0 KB | ||
03-S-001_General Notes | 3.0 MB | ||
04-S-100_Foundation Floor Plan | 609.9 KB | ||
05-S-101_First Floor Plan | 705.2 KB | ||
06-S-102_Alternate 2 Interior Wall Painting Plan | 560.1 KB | ||
07-S-200_North Elevation | 514.2 KB | ||
08-S-201_West Elevation | 528.0 KB | ||
09-S-202_South Elevation | 514.9 KB | ||
10-S-203_East Elevation | 535.8 KB | ||
11-S-204_Photos | 438.7 KB | ||
12-S-205_Alternate 1 North Elevation | 483.2 KB | ||
13-S-206_Alternate 1 West Elevation | 483.0 KB | ||
14-S-207_Alternate 1 South Elevation | 481.1 KB | ||
15-S-208_Alternate 1 East Elevation | 485.2 KB | ||
16-S-300_Rapair Details | 495.7 KB | ||
17-S-301_Foundation Details | 537.4 KB | ||
18-S-400_Wall Repair Details | 479.8 KB |