E2329-01 Foundation Stabilization & Waterproofing E.W. Thompson State School
The project consists of underpinning of existing strip & spread footings including excavation to bottom of footings, preparation & footings to receive underpinning and backfill. Also includes removal & replacement of exterior sidewalks & paving & interior slabs-on-grade along with the removal & replacement or reinstallation of interior floor finishes as part of the underpinning work. The interior faces of the perimeter CMU walls are to be re-pointed where cracks are present. All openings are to be re-caulked.
Addendum #1
(click to expand/collapse)
Name | Size | ||
E2329-01 Add #1 | 683.8 KB |
Addendum #2
(click to expand/collapse)
Name | Size | ||
E2329-01 Add #2 | 108.7 KB |