R2314-01 Second Fl Annex HVAC Unit Repl-MSHP General Hdq
Replacement of the existing air handling unit & boiler serving the hot water system for the MSHP GHQ, Annex Building. The third floor will require newly installed ductwork & new mixing boxes. In addition, new controls for the AHU, mixing boxes, & the boiler are required.
Specifications
(click to expand/collapse)
Name | Size | ||
01-Full Spec | 8.0 MB | ||
02-Division 00 | 3.6 MB | ||
03-Division 01 | 1.6 MB | ||
04-Division 02 | 121.6 KB | ||
05-Division 03 | 162.6 KB | ||
06-Division 09 | 696.3 KB | ||
07-Division 23 | 3.0 MB | ||
08-Division 26 | 802.4 KB | ||
09-Appendix | 1.1 MB |