R2314-01 Second Fl Annex HVAC Unit Repl-MSHP General Hdq

Replacement of the existing air handling unit & boiler serving the hot water system for the MSHP GHQ, Annex Building. The third floor will require newly installed ductwork & new mixing boxes. In addition, new controls for the AHU, mixing boxes, & the boiler are required.
Specifications (click to expand/collapse)
Name Size
01-Full Spec 8.0 MB
02-Division 00 3.6 MB
03-Division 01 1.6 MB
04-Division 02 121.6 KB
05-Division 03 162.6 KB
06-Division 09 696.3 KB
07-Division 23 3.0 MB
08-Division 26 802.4 KB
09-Appendix 1.1 MB