R2314-01 Second Fl Annex HVAC Unit Repl-MSHP General Hdq

Replacement of the existing air handling unit & boiler serving the hot water system for the MSHP GHQ, Annex Building. The third floor will require newly installed ductwork & new mixing boxes. In addition, new controls for the AHU, mixing boxes, & the boiler are required.
Issued for Bid (click to expand/collapse)