R2314-01 Second Fl Annex HVAC Unit Repl-MSHP General Hdq
Replacement of the existing air handling unit & boiler serving the hot water system for the MSHP GHQ, Annex Building. The third floor will require newly installed ductwork & new mixing boxes. In addition, new controls for the AHU, mixing boxes, & the boiler are required.
Issued for Bid
(click to expand/collapse)
Name | Size | ||
00-Full PDF of Plans | 7.4 MB | ||
01-G-001_Cover Sheet | 1.0 MB | ||
02-A-101_Mechanical Room Floor Plan and Details | 469.7 KB | ||
03-M-001_General Notes and Symbols | 362.3 KB | ||
04-M-101_Mechanical Room Demo Plan | 828.7 KB | ||
05-M-102_Third Floor Demo Plan | 936.3 KB | ||
06-M-103_Roof Demo Plan | 739.0 KB | ||
07-M-104_Mechanical Room Plan | 750.4 KB | ||
08-M-105_Third Floor Plan | 961.0 KB | ||
09-M-106_Roof Plan | 831.7 KB | ||
10-M-601_Schedules and Details | 1.0 MB | ||
11-M-602_Controls | 537.5 KB | ||
12-M-603_Controls | 499.9 KB | ||
13-E-101_Electrical Mechanical Room and Roof Plan | 758.4 KB | ||
14-E-102_Electrical Third Floor Plan | 702.6 KB |