R2314-01 Second Fl Annex HVAC Unit Repl-MSHP General Hdq
Replacement of the existing air handling unit & boiler serving the hot water system for the MSHP GHQ, Annex Building. The third floor will require newly installed ductwork & new mixing boxes. In addition, new controls for the AHU, mixing boxes, & the boiler are required.
Addendum #1
(click to expand/collapse)
Name | Size | ||
R2314-01 Addendum #1 | 52.3 KB |
Addendum #2
(click to expand/collapse)
Name | Size | ||
R2314-01 Add #2 | 930.3 KB |