E2329-01 Foundation Stabilization & Waterproofing E.W. Thompson State School
The project consists of underpinning of existing strip & spread footings including excavation to bottom of footings, preparation & footings to receive underpinning and backfill. Also includes removal & replacement of exterior sidewalks & paving & interior slabs-on-grade along with the removal & replacement or reinstallation of interior floor finishes as part of the underpinning work. The interior faces of the perimeter CMU walls are to be re-pointed where cracks are present. All openings are to be re-caulked.
Status
Bidding Closed
Prebid Date | 5/7/24 10:00am |
Bid Date | 5/21/24 1:30pm |
Company & Contacts
The State of Missouri Office of Administration
Scott Zeller
573-751-2668
Location
Sedalia, MO
Documents can be ordered online or by contacting ADS at 1400 Forum Blvd, Suite 7A, Columbia, MO 65203, Ph: (573) 446-7768, Email: orders@adsmo.net. A hard copy set of documents is available for a refundable deposit of $100, CHECK ONLY, payable to ADS and a copy can be emailed to us before you mail them. A download is available for a purchase (non-refundable) of $50 that can be paid via credit card (you will see this option only when logged in).