M2013-01 Replace Emergency Generator-Sexual Offender Treatment Center (Sorts)
The project includes the replacement of the existing generator with a new 800 kW 480/277V diesel fuel generator that will provide backup power to both the Blair and Hoctor Buildings for a duration of 96 hours, in the event of a power outage. The new generating system will include new distribution panels and step-down transformers at each building, with new feeders between the panels.
Specifications
(click to expand/collapse)
Name | Size | ||
01-Full Spec | 5.8 MB | ||
02-Division 00 | 2.0 MB | ||
03-Division 01 | 1.0 MB | ||
04-Division 02 | 250.8 KB | ||
05-Division 03 | 121.5 KB | ||
06-Division 05 | 218.9 KB | ||
07-Division 07 | 97.5 KB | ||
08-Division 26 | 1.2 MB | ||
09-Division 31 | 74.4 KB | ||
10-Division 32 | 255.3 KB |