M2013-01 Replace Emergency Generator-Sexual Offender Treatment Center (Sorts)

The project includes the replacement of the existing generator with a new 800 kW 480/277V diesel fuel generator that will provide backup power to both the Blair and Hoctor Buildings for a duration of 96 hours, in the event of a power outage. The new generating system will include new distribution panels and step-down transformers at each building, with new feeders between the panels.
Specifications (click to expand/collapse)
Name Size
01-Full Spec 5.8 MB
02-Division 00 2.0 MB
03-Division 01 1.0 MB
04-Division 02 250.8 KB
05-Division 03 121.5 KB
06-Division 05 218.9 KB
07-Division 07 97.5 KB
08-Division 26 1.2 MB
09-Division 31 74.4 KB
10-Division 32 255.3 KB