M2013-01 Replace Emergency Generator-Sexual Offender Treatment Center (Sorts)
The project includes the replacement of the existing generator with a new 800 kW 480/277V diesel fuel generator that will provide backup power to both the Blair and Hoctor Buildings for a duration of 96 hours, in the event of a power outage. The new generating system will include new distribution panels and step-down transformers at each building, with new feeders between the panels.
Issued for Bid
(click to expand/collapse)
Name | Size | ||
00-Full PDF of Plans | 3.4 MB | ||
01-G-001_Cover Sheet | 846.2 KB | ||
02-A-001_Architectural Plans and General Notes | 790.9 KB | ||
03-E-001_Site Plans | 801.5 KB | ||
04-E-101_Demo Floor Plans | 917.8 KB | ||
05-E-102_Floor Plans | 922.3 KB | ||
06-E-601_One Line Diagram | 1.0 MB | ||
07-E-602_Panel Schedules | 735.7 KB |