M2013-01 Replace Emergency Generator-Sexual Offender Treatment Center (Sorts)

The project includes the replacement of the existing generator with a new 800 kW 480/277V diesel fuel generator that will provide backup power to both the Blair and Hoctor Buildings for a duration of 96 hours, in the event of a power outage. The new generating system will include new distribution panels and step-down transformers at each building, with new feeders between the panels.
Issued for Bid (click to expand/collapse)