M2013-01 Replace Emergency Generator-Sexual Offender Treatment Center (Sorts)

The project includes the replacement of the existing generator with a new 800 kW 480/277V diesel fuel generator that will provide backup power to both the Blair and Hoctor Buildings for a duration of 96 hours, in the event of a power outage. The new generating system will include new distribution panels and step-down transformers at each building, with new feeders between the panels.

Status

Bidding Closed

Prebid Date 3/6/24 10:30am
Bid Date 3/21/24 1:30pm

Company & Contacts

The State of Missouri Office of Administration
Shannon Thompson  
573-526-3166

Location

Farmington, MO

Documents can be ordered online or by contacting ADS at 1400 Forum Blvd, Suite 7A, Columbia, MO 65203, Ph: (573) 446-7768, Email: orders@adsmo.net.  A hard copy set of documents is available for a refundable deposit of $100, CHECK ONLY, payable to ADS and a copy can be emailed to us before you mail them.  A download is available for a purchase (non-refundable) of $50 that can be paid via credit card (you will see this option only when logged in).