E2323-01 Stormwater Improvements-Special Acres State School
The project includes the installation of underground stormwater piping, grate inlet structure, flared end sections, existing underground stormwater piping and existing grate inlet structure removal, diversion drainage swale, discharge drainage swales, grading, asphalt pavement and curb removal and replacement, erosion control blankets, rip rap, erosion control/storm water pollution prevention, landscape / finish grading, seeding and fertilizing, all appurtenances and minor details necessary to make the completed improvements.
Issued for Bid
(click to expand/collapse)
Name | Size | ||
00-Full PDF of Plans | 17.7 MB | ||
01-G-001_Cover Sheet | 726.9 KB | ||
02-C-001_Notes and Abbreviations | 1.1 MB | ||
03-C-101_SWPPP Layout | 632.7 KB | ||
04-C-102_SWPPP Notes | 619.8 KB | ||
05-C-103_SWPPP Notes | 656.6 KB | ||
06-C-201_Stormwater Layout | 817.3 KB | ||
07-C-301_Stormwater Profiles | 514.3 KB | ||
08-C-501_Stormwater Details | 7.7 MB | ||
09-C-502_Stormwater Details | 7.0 MB |