C2303-01 Rebuild Cooling Tower, Bldg 7-Women's Eastern Reception, Diagnostic, & Correctional Center

The project includes removing and repairing a 1440 ton cooling for the campus chiller system. The Work includes removing existing cooling tower and all associated pipes, power, and controls. The Work includes installing pipes from mechanical room to equipment, new sediment filer, new structural steel, variable frequency drive for the fan motor, and all associated conduit and feeders from tunnel junction box to motors.
Specifications (click to expand/collapse)
Name Size
01-Full Spec 5.3 MB
02-Division 00 3.8 MB
03-Division 01 667.6 KB
04-Division 23 563.4 KB
05-Division 26 430.9 KB