C2303-01 Rebuild Cooling Tower, Bldg 7-Women's Eastern Reception, Diagnostic, & Correctional Center
The project includes removing and repairing a 1440 ton cooling for the campus chiller system. The Work includes removing existing cooling tower and all associated pipes, power, and controls. The Work includes installing pipes from mechanical room to equipment, new sediment filer, new structural steel, variable frequency drive for the fan motor, and all associated conduit and feeders from tunnel junction box to motors.
Specifications
(click to expand/collapse)
Name | Size | ||
01-Full Spec | 5.3 MB | ||
02-Division 00 | 3.8 MB | ||
03-Division 01 | 667.6 KB | ||
04-Division 23 | 563.4 KB | ||
05-Division 26 | 430.9 KB |