C2303-01 Rebuild Cooling Tower, Bldg 7-Women's Eastern Reception, Diagnostic, & Correctional Center
The project includes removing and repairing a 1440 ton cooling for the campus chiller system. The Work includes removing existing cooling tower and all associated pipes, power, and controls. The Work includes installing pipes from mechanical room to equipment, new sediment filer, new structural steel, variable frequency drive for the fan motor, and all associated conduit and feeders from tunnel junction box to motors.
Issued for Bid
(click to expand/collapse)
Name | Size | ||
00-Full PDF of Plans | 8.6 MB | ||
01-G-001_Cover Sheet | 331.4 KB | ||
02-M100_Site Plan | 690.0 KB | ||
03-DM101_Mechanical Demo Plan | 387.0 KB | ||
04-M101_Mechanical New Work Plan | 414.3 KB | ||
05-M102_Mechanical Schedules | 400.2 KB | ||
06-DM104_Mechanical Demo Schematics | 394.7 KB | ||
07-M104_Mechanical New Work Schematic | 415.8 KB | ||
08-M105_Mechanical Details | 420.0 KB | ||
09-M106_Mechanical General Notes | 371.8 KB | ||
10-E100_Electrical Power Plan | 1.0 MB | ||
11-S100_General Notes | 566.7 KB | ||
12-S200_Platform Plan & Details | 572.2 KB |