R2219-01 Construct New Headquarters - MSHP Troop A

The project includes constructing two new building of tilt-up concrete panels. Main building has steel structure and a TPO roof on steel decking and joists. Firing range building has steel structure and a TPO roof on a combination of steel decking, joists and precast concrete. The main building has a fire sprinkler system and a backup generator. Both buildings are served by gound-mount and rooftop HVAC units.
Specifications (click to expand/collapse)
Name Size
01-Vol 1 Full Spec 9.7 MB
02-Vol 2 Full Spec 18.3 MB
03-Division 00 4.1 MB
04-Division 01 1.2 MB
05-Division 02 119.7 KB
06-Division 03 341.6 KB
07-Division 04 67.8 KB
08-Division 05 428.4 KB
09-Division 06 198.9 KB
10-Division 07 738.0 KB
11-Division 08 1.0 MB
12-Division 09 831.0 KB
13-Division 10 841.9 KB
14-Division 11 93.1 KB
15-Division 12 166.2 KB
16-Division 21 1.0 MB
17-Division 22 905.5 KB
18-Division 23 1.9 MB
19-Division 26 1.6 MB
20-Division 27 1.0 MB
21-Division 28 748.4 KB
22-Division 31 330.4 KB
23-Division 32 1.0 MB
24-Division 33 762.1 KB
25-Appendices 12.6 MB