R2219-01 Construct New Headquarters - MSHP Troop A
The project includes constructing two new building of tilt-up concrete panels. Main building has steel structure and a TPO roof on steel decking and joists. Firing range building has steel structure and a TPO roof on a combination of steel decking, joists and precast concrete. The main building has a fire sprinkler system and a backup generator. Both buildings are served by gound-mount and rooftop HVAC units.
Addendum #1
(click to expand/collapse)
Name | Size | ||
R2219-01 Add #1 Plans & Specs | 5.2 MB |
Addendum #2
(click to expand/collapse)
Name | Size | ||
R2219-01 Add #2 Plan & Specs | 969.0 KB |
Addendum #3
(click to expand/collapse)
Name | Size | ||
R2219-01 Add #3 | 44.4 KB |
Addendum #4
(click to expand/collapse)
Name | Size | ||
R2219-01 Add #4 Plans & Specs | 5.8 MB |