T2226-01 Renovate USPFO Vault - USPFO Deployment Storage Facility - Ike Skelton Training Site
The project includes the selective demolition of existing interior building improvements, excavating, backfilling, and grading; interior concrete work (footings, foundations, interior reinforced concrete slab-on-grade, walls, and ceiling deck); installation of a Security Class 5 double-leaf steel vault door, frame and hardware; installation of metal guard rails at the perimeter of the vault ceiling deck; and the installation of new lighting circuits, fixtures, and controls to accommodate an addition to the existing Security Class 5 vault.
Issued for Bid
(click to expand/collapse)
Name | Size | ||
00-Full PDF of Plans | 8.9 MB | ||
01-G-001_Cover Page | 292.4 KB | ||
02-G-002_Location Maps and Drawing Index | 1.2 MB | ||
03-AD-100_Selective Demolition Plan - Existing Vault | 594.8 KB | ||
04-A-100_Vault Plan and Elevations - Existing and Addition | 846.6 KB | ||
05-A-300_Vault Wall Sections - Existing and Addition | 781.6 KB | ||
06-S-100_General Structural Data | 658.3 KB | ||
07-S-200_Foundation Plans and Details | 636.0 KB | ||
08-S-300_Roof Plan and Details | 644.8 KB | ||
09-ME-101_Mechanical and Electrical Plans | 527.5 KB | ||
10-ME-501_Mechanical and Electrical Details and Schedules | 395.4 KB |