T2226-01 Renovate USPFO Vault - USPFO Deployment Storage Facility - Ike Skelton Training Site
The project includes the selective demolition of existing interior building improvements, excavating, backfilling, and grading; interior concrete work (footings, foundations, interior reinforced concrete slab-on-grade, walls, and ceiling deck); installation of a Security Class 5 double-leaf steel vault door, frame and hardware; installation of metal guard rails at the perimeter of the vault ceiling deck; and the installation of new lighting circuits, fixtures, and controls to accommodate an addition to the existing Security Class 5 vault.
Addendum #1
(click to expand/collapse)
Name | Size | ||
T2226-01 Add #1 | 829.1 KB |