C1904-01 HVAC System Upgrade-Transition Center of Kansas City

Replacing existing system with a 4 pipe system with air cooled chiller, boilers, pumps, & new BAS.
Specifications (click to expand/collapse)
Name Size
01-Full Spec 17.9 MB
02-Division 00 4.7 MB
03-Division 01 914.8 KB
04-Division 02 52.4 KB
05-Division 04 53.4 KB
06-Division 07 53.4 KB
07-Division 08 167.1 KB
08-Division 09 113.8 KB
09-Division 23 5.7 MB
10-Division 25 286.7 KB
11-Division 26 520.4 KB
12-Division 28 5.4 MB