C1904-01 HVAC System Upgrade-Transition Center of Kansas City
Replacing existing system with a 4 pipe system with air cooled chiller, boilers, pumps, & new BAS.
Addendum #1
(click to expand/collapse)
Name | Size | ||
C1904-01 Add #1 | 1.0 MB |
Addendum #2
(click to expand/collapse)
Name | Size | ||
C1904-01 Add #2 | 109.9 KB |
Addendum #3
(click to expand/collapse)
Name | Size | ||
C1904-01 Add #3 Plans & Specs | 6.1 MB |