C1904-01 HVAC System Upgrade-Transition Center of Kansas City

Replacing existing system with a 4 pipe system with air cooled chiller, boilers, pumps, & new BAS.
Addendum #1 (click to expand/collapse)
Name Size
C1904-01 Add #1 1.0 MB
Addendum #2 (click to expand/collapse)
Name Size
C1904-01 Add #2 109.9 KB
Addendum #3 (click to expand/collapse)