T2225-01 Combined Support Maintenance Shop (CSMS) Interior Renov & Reroof-Ike Skelton Training Site
The project consists of: Replace existing standing seam metal roof and associated trim, gutters, and downspouts in all areas with the exception of the roof over the shop bays in the paint and blast area. Replace all metal coping including any damaged wood blocking at parapets. Replace electrostatic floor tiles in Armament, Instrument Repair, Storage, and Calibrate Rooms. Replace VCT in Physical and Rad Rooms. Add additional LED light fixtures in Armament and Instrument Repair.
Specifications
(click to expand/collapse)
Name | Size | ||
01-Full Spec | 9.8 MB | ||
02-Division 00 | 3.4 MB | ||
03-Division 01 | 921.8 KB | ||
04-Division 02 | 84.9 KB | ||
05-Division 03 | 192.7 KB | ||
06-Division 05 | 96.1 KB | ||
07-Division 06 | 72.2 KB | ||
08-Division 07 | 540.4 KB | ||
09-Division 08 | 150.6 KB | ||
10-Division 09 | 582.2 KB | ||
11-Division 22 | 508.4 KB | ||
12-Division 23 | 226.0 KB | ||
13-Division 26 | 343.8 KB | ||
14-Exhibits | 1.6 MB |