T2225-01 Combined Support Maintenance Shop (CSMS) Interior Renov & Reroof-Ike Skelton Training Site

The project consists of: Replace existing standing seam metal roof and associated trim, gutters, and downspouts in all areas with the exception of the roof over the shop bays in the paint and blast area. Replace all metal coping including any damaged wood blocking at parapets. Replace electrostatic floor tiles in Armament, Instrument Repair, Storage, and Calibrate Rooms. Replace VCT in Physical and Rad Rooms. Add additional LED light fixtures in Armament and Instrument Repair.
Specifications (click to expand/collapse)
Name Size
01-Full Spec 9.8 MB
02-Division 00 3.4 MB
03-Division 01 921.8 KB
04-Division 02 84.9 KB
05-Division 03 192.7 KB
06-Division 05 96.1 KB
07-Division 06 72.2 KB
08-Division 07 540.4 KB
09-Division 08 150.6 KB
10-Division 09 582.2 KB
11-Division 22 508.4 KB
12-Division 23 226.0 KB
13-Division 26 343.8 KB
14-Exhibits 1.6 MB