T2225-01 Combined Support Maintenance Shop (CSMS) Interior Renov & Reroof-Ike Skelton Training Site
The project consists of: Replace existing standing seam metal roof and associated trim, gutters, and downspouts in all areas with the exception of the roof over the shop bays in the paint and blast area. Replace all metal coping including any damaged wood blocking at parapets. Replace electrostatic floor tiles in Armament, Instrument Repair, Storage, and Calibrate Rooms. Replace VCT in Physical and Rad Rooms. Add additional LED light fixtures in Armament and Instrument Repair.
Issued for Bid
(click to expand/collapse)
Name | Size | ||
00-Full PDF of Plans | 10.2 MB | ||
01-G-001_Cover Sheet | 363.7 KB | ||
02-S-101_Generla Notes and Details | 659.5 KB | ||
03-A-001_Site Plan | 594.7 KB | ||
04-A-002_Code Data, Egress Floor Plan, Notes and Symbols | 703.9 KB | ||
05-A-101_Center Core Floor Plan | 558.2 KB | ||
06-A-102_Demo and New Floor Plans | 862.3 KB | ||
07-A-103_Demo and New Roof Plans | 634.0 KB | ||
08-A-201_Elevations | 671.4 KB | ||
09-A-301_Wall Sections | 584.2 KB | ||
10-A-501_Roof Details | 554.3 KB | ||
11-A-601_Door and Finish Schedules and Door Types | 728.1 KB | ||
12-A-701_Demo and New Reflected Ceiling Plans | 857.7 KB | ||
13-A-702_Work Bays Reflected Ceiling Plans | 678.8 KB | ||
14-M-101_Demo and New Floor Plans | 619.7 KB | ||
15-M-102_Work Bays Demo Plans | 694.0 KB | ||
16-M-103_Work Bays Floor Plans | 724.6 KB | ||
17-M-601_Schedules | 626.8 KB | ||
18-E-101_Floor Plans | 1.0 MB | ||
19-E-102_Demo Work Bays Floor Plans | 657.5 KB | ||
20-E-103_Lighting Plans | 643.3 KB | ||
21-E-104_North South Bays Plans | 707.5 KB | ||
22-E-601_Legend and Schedules | 1.5 MB |