C2010-01 Replace BAS & HVAC System-Supervision Center Bldg-Community Supervision Center
The project includes replacing 3 existing condensing units along with associated DX coils. A new chiller shall be installed with associated chiller water system. New chilled water coils shall be installed in existing air handling units. The existing BAS shall be upgraded.
Specifications
(click to expand/collapse)
Name | Size | ||
01-Full Spec | 6.2 MB | ||
02-Division 00 | 2.8 MB | ||
03-Division 01 | 1.0 MB | ||
04-Division 23 | 1.5 MB | ||
05-Division 26 | 1.1 MB |