C2010-01 Replace BAS & HVAC System-Supervision Center Bldg-Community Supervision Center
The project includes replacing 3 existing condensing units along with associated DX coils. A new chiller shall be installed with associated chiller water system. New chilled water coils shall be installed in existing air handling units. The existing BAS shall be upgraded.
Issued for Bid
(click to expand/collapse)
Name | Size | ||
00-Full PDF of Plans | 2.6 MB | ||
01-G-000_Cover Sheet | 439.2 KB | ||
02-M-001_Mechanical Symbols & Legend | 208.9 KB | ||
03-MD-101_Mechanical Demolition | 293.4 KB | ||
04-M-201_Mechanical Floor Plan | 375.7 KB | ||
05-M-401_Enlarged Plan Mechanical | 243.7 KB | ||
06-M-501_Mechanical Details | 236.3 KB | ||
07-M-502_Chilled Water Schematic | 189.5 KB | ||
08-M-601_Mechanical Schedules | 157.3 KB | ||
09-M-701_Mechanical Controls | 238.3 KB | ||
10-E-001_Electrical Symbols & Legend | 239.2 KB | ||
11-ED-101_Electrical Demolition | 352.2 KB | ||
12-ED-201_Enlarged Demo Plans Electrical | 240.4 KB | ||
13-E-101_Enlarged Plans Electrical | 280.5 KB |