C2010-01 Replace BAS & HVAC System-Supervision Center Bldg-Community Supervision Center
The project includes replacing 3 existing condensing units along with associated DX coils. A new chiller shall be installed with associated chiller water system. New chilled water coils shall be installed in existing air handling units. The existing BAS shall be upgraded.
Status
Bidding Closed
Prebid Date | 11/29/22 10:00am |
Bid Date | 12/20/22 1:30pm |
Company & Contacts
The State of Missouri Office of Administration
Christopher Lloyd
christopher.lloyd@oa.mo.gov
Location
Hannibal, MO
Documents can be ordered online or by contacting ADS at 1400 Forum Blvd, Suite 7A, Columbia, MO 65203, Ph: (573) 446-7768, Email: orders@adsmo.net. A hard copy set of documents is available for a refundable deposit of $30, CHECK ONLY, payable to ADS and a copy can be emailed to us before you mail them. A download is available for a purchase (non-refundable) of $30 that can be paid via credit card (you will see this option only when logged in).