C2001-01 Replace Kitchen Flooring (3rd Floor) Western Reception Diagnostic Correctional Center
The project includes removing the existing kitchen flooring, installing new floor sinks, plumbing piping, repair the floor drains to correct an issue with water filtration, and installation of the new floor tiling.
Specifications
(click to expand/collapse)
Name | Size | ||
01-Full Spec | 4.1 MB | ||
02-Division 00 | 3.2 MB | ||
03-Division 01 | 933.9 KB | ||
04-Division 02 | 70.2 KB | ||
05-Division 03 | 99.6 KB | ||
06-Division 07 | 650.2 KB | ||
07-Division 09 | 70.9 KB | ||
08-Division 22 | 1.0 MB |