C2001-01 Replace Kitchen Flooring (3rd Floor) Western Reception Diagnostic Correctional Center
The project includes removing the existing kitchen flooring, installing new floor sinks, plumbing piping, repair the floor drains to correct an issue with water filtration, and installation of the new floor tiling.
Addendum #1
(click to expand/collapse)
Name | Size | ||
C2001-01 Add #1 | 622.1 KB |