U2002-01 Replace HVAC System, Administration Building-Bloomfield Veterans Cemetery
The project includes replacing 7 water-source heat pumps with 5 water-source heat pumps & all ductwork modifications required to combine systems. A water to water heat pump will also be replaced as well as associated radiant floor pump, circulators & pipe. Pipe embedded in the radiant floor is not being replaced.
Specifications
(click to expand/collapse)
Name | Date | Size | ||
01-Full Spec | 8/15/2022 | 3.0 MB | ||
02-Division 00 | 8/15/2022 | 2.5 MB | ||
03-Division 01 | 8/15/2022 | 494.4 KB | ||
04-Division 23 | 8/15/2022 | 410.2 KB | ||
05-Division 26 | 8/15/2022 | 254.1 KB |