U2002-01 Replace HVAC System, Administration Building-Bloomfield Veterans Cemetery
The project includes replacing 7 water-source heat pumps with 5 water-source heat pumps & all ductwork modifications required to combine systems. A water to water heat pump will also be replaced as well as associated radiant floor pump, circulators & pipe. Pipe embedded in the radiant floor is not being replaced.
Issued for Bid
(click to expand/collapse)
Name | Date | Size | ||
00-Full PDF of Plans | 8/15/2022 | 3.2 MB | ||
01-G-001_Title Sheet | 8/15/2022 | 114.1 KB | ||
02-G-002_Site Maps, Drawing Index and General Requirements | 8/15/2022 | 514.5 KB | ||
03-M-101_Admin Building Mech HVAC Demo Plan | 8/15/2022 | 538.6 KB | ||
04-M-102_Admin Building Mech Pipe Demo Plan | 8/15/2022 | 505.3 KB | ||
05-M-103_Admin Building Mech HVAC Construction Plan | 8/15/2022 | 878.1 KB | ||
06-M-104_Admin Building Mech Pipe Construction Plan | 8/15/2022 | 492.5 KB | ||
07-M-601_Admin Building Mech Pipe Diagram | 8/15/2022 | 562.0 KB | ||
08-M-602_Schedules and Details | 8/15/2022 | 631.8 KB | ||
09-E-101_Admin Building Electrical Demo Plan | 8/15/2022 | 536.6 KB | ||
10-E-102_Admin Building Electrical Construction Plan | 8/15/2022 | 464.3 KB | ||
11-E-601_Panel Schedules | 8/15/2022 | 630.3 KB | ||
12-E-602_Panel Schedules | 8/15/2022 | 582.7 KB |