C1922-01 Replace Roof System, Multiple Assets-Farmington Correctional Center
The project includes the complete tear-off of the existing shingle roofing system, removal of existing dormers, repair of existing wood soffits and fascia and installation of a new standing seam metal roofing system at seven (7) buildings located at Farmington Correctional Center (FCC). The buildings included in this project include the following: Medical Building #16, Food Service Building #17 A-side, Education Building #18 (Alternate #1), Library Building #19 (Alternate #2), Boot Camp Building #31 (Alternate #3), Chapel Building #32 B-Side, and Warehouse Building #33 B-Side (Alternate #4).
Specifications
(click to expand/collapse)
Name | Date | Size | ||
01-Full Spec | 6/21/2022 | 5.9 MB | ||
02-Division 00 | 6/21/2022 | 3.8 MB | ||
03-Division 01 | 6/21/2022 | 1.7 MB | ||
04-Division 02 | 6/21/2022 | 1.2 MB | ||
05-Division 06 | 6/21/2022 | 1.2 MB | ||
06-Division 07 | 6/21/2022 | 1.5 MB | ||
07-Division 09 | 6/21/2022 | 1.2 MB | ||
08-Division 23 | 6/21/2022 | 1.5 MB | ||
09-Division 26 | 6/21/2022 | 1.4 MB | ||
10-Appendix | 6/21/2022 | 850.2 KB |