C1922-01 Replace Roof System, Multiple Assets-Farmington Correctional Center
The project includes the complete tear-off of the existing shingle roofing system, removal of existing dormers, repair of existing wood soffits and fascia and installation of a new standing seam metal roofing system at seven (7) buildings located at Farmington Correctional Center (FCC). The buildings included in this project include the following: Medical Building #16, Food Service Building #17 A-side, Education Building #18 (Alternate #1), Library Building #19 (Alternate #2), Boot Camp Building #31 (Alternate #3), Chapel Building #32 B-Side, and Warehouse Building #33 B-Side (Alternate #4).
Addendum #1
(click to expand/collapse)
Name | Date | Size | ||
C1922-01 Add #1 | 7/21/2022 | 596.1 KB |