X1807-01 Water System Improvements Bennett Spring State Park
The project consists of highway road bores, wet taps, waterline connection to Laclede PWSD #1 along with new meter, pressure reducing valves, backflow prevention, main valve arrangement with pressure sustaining valve, a booster station, and the construction of water lines; complete with appurtenances, disinfection, a tracer wire system, plus pressure & leakage tests.
Specifications
(click to expand/collapse)
Name | Date | Size | ||
01-Full Spec | 6/9/2022 | 6.8 MB | ||
02-Division 00 | 6/9/2022 | 3.5 MB | ||
03-Division 01 | 6/9/2022 | 1.5 MB | ||
04-Division 02 | 6/9/2022 | 1.1 MB | ||
05-Division 03 | 6/9/2022 | 194.8 KB | ||
06-Division 22 | 6/9/2022 | 99.4 KB | ||
07-Division 26 | 6/9/2022 | 108.6 KB | ||
08-Division 31 | 6/9/2022 | 108.0 KB | ||
09-Division 32 | 6/9/2022 | 201.6 KB | ||
10-Division 33 | 6/9/2022 | 126.4 KB | ||
11-Appendix | 6/9/2022 | 1.5 MB |