X1807-01 Water System Improvements Bennett Spring State Park
The project consists of highway road bores, wet taps, waterline connection to Laclede PWSD #1 along with new meter, pressure reducing valves, backflow prevention, main valve arrangement with pressure sustaining valve, a booster station, and the construction of water lines; complete with appurtenances, disinfection, a tracer wire system, plus pressure & leakage tests.
Addendum #1
(click to expand/collapse)
Name | Date | Size | ||
X1807-01 Add #1 | 7/6/2022 | 416.5 KB |