C2303-01 Rebuild Cooling Tower, Bldg 7-Women's Eastern Reception, Diagnostic, & Correctional Center
The project includes removing and repairing a 1440 ton cooling for the campus chiller system. The Work includes removing existing cooling tower and all associated pipes, power, and controls. The Work includes installing pipes from mechanical room to equipment, new sediment filer, new structural steel, variable frequency drive for the fan motor, and all associated conduit and feeders from tunnel junction box to motors.
Status
Bidding Closed
Prebid Date | 10/20/23 10:00am |
Bid Date | 11/2/23 1:30pm |
Company & Contacts
The State of Missouri Office of Administration
Shannon Thompson
shannon.thompson@oa.mo.gov
Location
Vandalia, MO
Documents can be ordered online or by contacting ADS at 1400 Forum Blvd, Suite 7A, Columbia, MO 65203, Ph: (573) 446-7768, Email: orders@adsmo.net. A hard copy set of documents is available for a refundable deposit of $30, CHECK ONLY, payable to ADS and a copy can be emailed to us before you mail them. A download is available for a purchase (non-refundable) of $30 that can be paid via credit card (you will see this option only when logged in).