M2409-01 Upgrade Electrical Service - Rolla Regional Office
The project includes replacement of the main distribution panel, (9) panel interiors, and (1) new panel interior with box. All panels shall have new covers, trims, and breakers. The Work will be conducted in multiple phases due to the number of panels being replaced. Phasing will be discussed during the pre-bid meeting. It is expected that the panel replacement be phased to minimize any down time. The main distribution panel may be replaced over a weekend or holiday to prevent the need for temporary power during the renovation.
Specifications
(click to expand/collapse)

Name | Size | ||
01-Full Spec | 1.8 MB | ||
02-Division 00 | 1.3 MB | ||
03-Division 01 | 309.0 KB | ||
04-Division 26 | 300.9 KB |