O2353-01 Chilled Water Renovations Missouri State Capitol Building

The project includes installation of chilled water pumps, along with modifications of piping, ductwork modifications, controls, and sequences of operations.
Specifications (click to expand/collapse)
Name Size
01-Full Spec 8.2 MB
02-Division 00 3.3 MB
03-Division 01 963.9 KB
04-Division 23 2.9 MB
05-Division 26 1.1 MB