R2407-01 Replace Roof System & Selective Ceiling Demolition-MSHP Flight Operations Hangar
The project includes removal of the existing overlay metal roof and hugger system, including hugger system nailer/purlins overexisting metal roof. Remove existing gutters, downspouts, flashing, etc. Install all new polyvinyl-chloride (PVC) roofing system over original metal roof, new insulation and coverboard. Install all new flashing systems, gutters, downspouts and splash pads, etc. Work also includes selective interior demolition of the existing PEMB Insulation system at the roof level to be trimmed neatly at girt locations and prepare exposed underside of existing roof panel to be painted. Additional demolition includes selective demolition of existing overhead door tracks that are abandoned and no longer in use at both the south and north hanger bays. The total R-Value to be added at the roof level for continuous exterior layers of insulation shall meet the requirements outlined in the drawings and Division 07 - 075419 PVC Roofing related to 2.5 Roof Insulation, achieving an R-value of R-41.5.
Specifications
(click to expand/collapse)
Name | Size | ||
01-Full Spec | 5.6 MB | ||
02-Division 00 | 3.7 MB | ||
03-Division 01 | 1.0 MB | ||
04-Division 02 | 163.2 KB | ||
05-Division 05 | 146.2 KB | ||
06-Division 07 | 857.9 KB |