T2329-01 HVAC Repairs, Blade & Paint Shop Bldg - AVCRAD Army Aviation Site
Removal or remediation of flaking, spalling, & peeling paint on existing ductwork throughout AVCRAD Bldg 29. Project shall contain or encapsulate existing paint & install products that will match design standards set forth by the existing building design.
Specifications
(click to expand/collapse)
Name | Size | ||
01-Full Spec | 2.6 MB | ||
02-Division 00 | 1.6 MB | ||
03-Division 01 | 1.0 MB | ||
04-Division 23 | 49.8 KB |