O2440-01 Repl HVAC, Structural Repairs, & Repl Roof-George Washington Carver State Office Building
Volume 1: The project includes complete replacement of the HVAC system including removal and replacement of hydronic pumps, chillers, boilers, basement air handling unit, ductless split systems, and hydronic fan coil units. Volume 2: The project includes the addition of reinforcing elements at concrete slabs and at slab-to column interfaces. Volume 3: The project includes removing the existing roof system down to the roof deck, removing existing gutters and downspouts, coordinating with the installation of roof structural reinforcement (Volume 2) work, installing new roof system, installing new gutters and downspouts, and installing new cage ladder.
Specifications
(click to expand/collapse)
Name | Size | ||
01-Volume 1 Full Spec | 113.0 MB | ||
02-Division 00 | 4.5 MB | ||
03-Division 01 | 12.5 MB | ||
04-Division 02 | 16.8 MB | ||
05-Division 04 | 1.3 MB | ||
06-Division 05 | 1.1 MB | ||
07-Division 06 | 1.6 MB | ||
08-Division 07 | 5.0 MB | ||
09-Division 08 | 2.4 MB | ||
10-Division 09 | 8.6 MB | ||
11-Division 10 | 738.0 KB | ||
12-Division 22 | 3.5 MB | ||
13-Division 23 | 34.1 MB | ||
14-Division 26 | 6.8 MB | ||
15-Appendices | 15.2 MB | ||
16-Volume 2 Full Spec | 3.5 MB | ||
17-Division 00 | 2.5 MB | ||
18-Division 01 | 837.5 KB | ||
19-Division 02 | 102.1 KB | ||
20-Division 03 | 601.3 KB | ||
21-Division 07 | 81.1 KB | ||
22-Division 09 | 88.0 KB | ||
23-Volume 3 Full Spec | 2.6 MB | ||
24-Division 00 | 1.4 MB | ||
25-Division 01 | 210.3 KB | ||
26-Division 02 | 75.4 KB | ||
27-Division 05 | 75.8 KB | ||
28-Division 06 | 87.5 KB | ||
29-Division 07 | 117.1 KB | ||
30-Appendices | 1.1 MB |