U2302-02 Minor Renovations for Infection Control Warrensburg Veterans Home
Furnishing all labor, materials, and services necessary for selective demolition, removal of on-site room furnishings out of the area of work prior to construction & back into area of work after completion of each construction phase; removal of existing carpet, Luxury Vinyl tile, and Vinyl Composition Tile, cleaning & preparation of flooring substrates, & installation of new Luxury Vinyl Tile plank flooring.
Issued for Bid
(click to expand/collapse)
Name | Size | ||
00-Full PDF of Plans | 4.6 MB | ||
01-G-001_Cover Sheet | 97.1 KB | ||
02-G-002_Overall Site Plan and Sheet Index | 3.2 MB | ||
03-A-101_Phase 1 and 2 - Unit E Floor Plan | 1.4 MB | ||
04-A-501_Typical Details and Finish Schedule | 802.2 KB |