T2301-02 Connect Camp Clark Sewer System to City of Nevada Sewer System
Sanitary sewer improvements at Camp Clark. Work includes demolishing the existing wastewater treatment lagoons, building a lift station, and installing approximately 7,964 L.F. of 6" diameter pressure sewer pipe to send all on-site sewage to the City of Nevada's sanitary sewer system.
Addendum #1
(click to expand/collapse)
Name | Size | ||
T2301-02 Add #1 Plans & Specs | 10.4 MB |
Addendum #2
(click to expand/collapse)
Name | Size | ||
REVISED T2301-02 Add #2 | 1.1 MB |