O2324-01 Improvements to HVAC - Broadway State Office Building

Demolition of existing HVAC equipment & ductwork, the installation of new ductwork, piping, insulation, hydronic coils & heat exchanger. All required electrical system, and building automation system modifications as well as asbestos abatement.
Specifications (click to expand/collapse)
Name Size
01-Full Spec 22.5 MB
02-Division 00 3.1 MB
03-Division 01 845.8 KB
04-Division 02 15.6 MB
05-Division 23 1.5 MB
06-Division 26 750.5 KB