C1921-01 Replace Steam, Water, & Sewer Lines, Building 3-Maryville Treatment Center
The project includes hazardous material abatement in tunnels and plumbing chases; replacement of domestic water and/or sanitary waste & vent piping mains in main plumbing chases and tunnels; replacement of the old steam heating system throughout the buildings with a new 2-pipe hydronic system; replacement of main plumbing equipment; and electrical upgrades as required to accommodate the new mechanical & plumbing equipment
Addendum #1
(click to expand/collapse)
Name | Size | ||
C1921-01 Add #1 Plan & Specs | 1.5 MB |