H2306-01 Replace Fire Sprinkler System, Cottage 2 (Bissel Hall)-Missouri Hills Youth Center
Demolishing the existing wet sprinkler system & water entrance up to the interior shut-off valve, installing a new wet sprinkler system, and installing a new dry sprinkler system for the attic within Cottage 2.
Issued for Bid
(click to expand/collapse)
Name | Size | ||
00-Full PDF of Plans | 3.0 MB | ||
01-G1.0_Cover Sheet | 1.1 MB | ||
02-F0.1_Fire Protection Symbols, Notes, Legends, and Schedules | 253.8 KB | ||
03-FD1.1_Floor Plans - Demolition | 793.1 KB | ||
04-F1.1_Basement Floor Plan - Renovation | 485.6 KB | ||
05-F1.2_First Floor Plan - Renovation | 366.4 KB | ||
06-F1.3_Second Floor Plan - Renovation | 517.2 KB | ||
07-F1.4_Attic Floor Plan - Renovation | 370.5 KB | ||
08-F5.1_Details | 376.9 KB | ||
09-E0.1_Electrical Symbols, Abbreviations, and General Notes | 329.2 KB | ||
10-E1.0_Systems Plan - Renovation | 317.9 KB |