O1911-01 Renovate Mechanical/Electrical/Life Safety - Jefferson State Office Building
The project includes full HVAC Renovation, plumbing riser and fixture replacement, fire alarm replacement, cubicle replacement or refurbishment in open areas and enclosed rooms as necessary, electrical power and low voltage to furniture, lighting and ADA Bathroom updates, carpeting, paint, power and horizontal data cabling, 13th floor data room decommissioning, lighting, security card access, breakroom modifications and expansions, first floor lobby updates, cafeteria updates (including furniture) and first floor modifications for DESE open office, conference/training center, furniture and new first floor ADA restroom as required by code. No upgrades or modifications to the fire sprinkler system are included in this scope other than sprinkler head modifications due to floor layout.
Specifications
(click to expand/collapse)
Name | Size | ||
01-Full Spec Volume 1 | 13.9 MB | ||
02-Full Spec Volume 2 | 7.3 MB | ||
03-Full Spec Volume 3 | 23.4 MB | ||
04-Division 00 | 5.8 MB | ||
05-Division 01 | 5.3 MB | ||
06-Division 02 | 2.6 MB | ||
07-Division 03 | 1.4 MB | ||
08-Division 04 | 1.2 MB | ||
09-Division 05 | 313.0 KB | ||
10-Division 06 | 685.0 KB | ||
11-Division 07 | 1.6 MB | ||
12-Division 08 | 1.9 MB | ||
13-Division 09 | 2.0 MB | ||
14-Division 10 | 1.8 MB | ||
15-Division 12 | 1.9 MB | ||
16-Division 20 | 351.6 KB | ||
17-Division 21 | 345.3 KB | ||
18-Division 22 | 1.1 MB | ||
19-Division 23 | 2.5 MB | ||
20-Division 26 | 2.9 MB | ||
21-Division 27 | 1.5 MB | ||
22-Division 28 | 501.9 KB | ||
23-Division 31 | 338.9 KB | ||
24-Division 32 | 338.6 KB | ||
25-Appendix | 13.3 MB |