C2006-01 Replace Boilers & Controls-Farmington Correctional Center

The project includes replacing burners and boiler controls on three 41,000 MBH steam boilers, demolishing (2) Existing Steam Boilers, installing a new steam to domestic hot water plant to support the south loop, installing a new steam to heating water plant to support the south loop, installing a new domestic water booster skid to support the plant and campus, installing new preinsulated fiberglass piping from central plant to south loop, and all infrastructure to support scope listed above. Volume 2 (Alternate #1): The Work includes, but is not limited to, the demolition of steam engine generators, replacement of existing pumped condensate and make-up water piping systems, the installation of a new reverse water treatment system, RO water storage tank, RO water feed pumps, and associated structural, plumbing, piping, insulation, power, control, and instrumentation systems.
Issued for Bid (click to expand/collapse)
Name Size
00-Vol 1 PDF of Plans 23.2 MB
00-Vol 2 PDF of Plans 18.3 MB
01-CS-1_Volume 1 Cover Sheet 271.5 KB
02-CU.1_Piping Trench and Plan Profile 2.1 MB
03-CU.2_Piping Trench and Plan Profile 1.7 MB
04-CU.3_Piping Trench and Plan Profile 1.6 MB
05-M0.0_Symbols and Abbreviations 245.6 KB
06-MD3.0_Lower Level South Demo Plan 258.1 KB
07-MD3.1_Main Level North Demo Plan 295.4 KB
08-MD3.2_Main Level Central Demo Plan 321.4 KB
09-MD3.3_Main Level South Demo Plan 276.8 KB
10-M1.1_Site New Work Plan 303.1 KB
11-M3.0_Lower Level South New Work Plan 270.4 KB
12-M3.1_Main Level North New Work Plan 301.8 KB
13-M3.2_Main Level Central New Work Plan 315.0 KB
14-M3.3_Main Level South New Work Plan 306.7 KB
15-M5.0_Domestic Cold Water Flow Diagram 302.3 KB
16-M5.1_Domestic Hot Water Flow Diagram 305.4 KB
17-M5.2_Steam Flow Diagram 297.5 KB
18-M5.3_Heating Water Flow Diagram 316.6 KB
19-M5.4_Steam Boiler Burner and Controls Schematic 240.2 KB
20-M5.5_Integrated Automation Control Sequences for HVAC 7.0 MB
21-M6.0_Schedules 894.1 KB
22-M6.1_Details 306.0 KB
23-P3.0_Lower Level South New Work Plan 252.4 KB
24-P3.1_Main Level South New Work Plan 268.4 KB
25-E1.0_Symbols and Abbreviations 338.1 KB
26-ED3.1_Main Level Central Demo Plan 326.3 KB
27-ED3.2_Main Level South Demo Plan 321.0 KB
28-E3.0_Main Level North New Work Plan 356.1 KB
29-E3.1_Main Level Central New Work Plan 343.8 KB
30-E3.2_Main Level South New Work Plan 347.0 KB
31-E6.0_One Line Diagrams, Details and Schedules 466.4 KB
32-G-001_Volume 2 Cover Sheet 244.6 KB
33-G-002_Site Maps and Drawing Index 845.0 KB
34-G-003_Construction Limits, Schedule and Phasing 976.3 KB
35-SD-401_Demo Plan Power Plant H2O Treatment 856.9 KB
36-SD-402_Demo Plan Power Plant Basement 616.5 KB
37-S-401_Power Plant H2O Treatment Plan 749.1 KB
38-S-402_Sections and Details 709.0 KB
39-MD-401_Demo Plan Power Plant 848.5 KB
40-MD-601_Flow Diagram Demo H2O Treatment 701.5 KB
41-M-401_Power Plant H2O Treatment 721.8 KB
42-M-501_Details 1.3 MB
43-M-600_Symbols and Schedules 676.2 KB
44-M-601_Flow Diagram H2O Treatment 795.4 KB
45-M-602_Flow Diagram RO Water System 824.7 KB
46-MP-401_Piping Plan Power Plant Low 774.1 KB
47-MP-402_Piping Plan Power Plant High 897.2 KB
48-MP-403_Piping Plan Power Plant East 688.1 KB
49-P-401_Power Plant H2O Treatment 808.7 KB
50-E-001_Symbols, Abbreviations and General Notes 904.8 KB
51-ED-401_Demo Plan Power Plant 665.4 KB
52-E-401_Power Plant Plan 1.0 MB
53-E-501_Schedules, Details and Elevations 756.3 KB
54-E-601_One Line Diagram North 712.5 KB
55-E-602_Motor Wiring Schematic 633.4 KB