T2218-01 Auditorium Renovation-Ike Skelton Training Site
The Project consists of the interior renovation of the Ike Skelton Training Site Auditorium and Sound Booth. The renovation will include the removal and replacement of the ceiling, new LED lighting and AV sound / projection equipment, painting of the walls in the auditorium and sound booth, replacement of the flooring and installing new seating. It will also include minor HVAC removal and replacement along with adding an ADA chair lift to access the upper level of the stage.
Issued for Bid
(click to expand/collapse)
Name | Size | ||
00-Full PDF of Plans | 70.0 MB | ||
01-G001_Cover Sheet | 446.0 KB | ||
02-A100_Key Floor Plan, Floor Plan, RCP, and Scope of Work | 634.7 KB | ||
03-A200_Cross Sections and Stage Back Wall Elevation | 950.9 KB | ||
04-M100_HVAC Plan | 186.9 KB | ||
05-E100_Power Plan | 187.3 KB | ||
06-E200_AV Floor Plan | 2.3 MB |