T2208-01 Renovate Interior & Exterior-Moberly Readiness Center
The exterior renovation will include the removal & replacement of all roofing, soffit, fascia, downspouts, & gutters; replacement of windows; minor brick repair & replacement; and the removal & replacement of the paint on the metal wall panels on the upper portion & East face of the Assembly Hall. Interior renovation will consist of complete gutting & remodel of the bathrooms & kitchen, painting all walls, removal & replacement of some flooring and some ceilings. Electrical system upgrades include all new electrical distribution & branch panels, new manual transfer switch, all new LED lighting, new receptacles/devices, new exterior parking lighting. Mechanical system upgrades include all new HVAC equipment & removal of un-operational equipment. Plumbing system upgrades include new hot water heaters & distribution piping to new restrooms & renovated kitchen area, and a new grease interceptor for food preparation. The drives, parking, sidewalks, street entrances, & some fencing will also be replaced and a storm drain system installed to direct water from the roof to the storm drain. The project has two alternates, removal of existing boiler and installation of a new generator.
Specifications
(click to expand/collapse)
Name | Size | ||
01-Full Spec | 27.7 MB | ||
02-Division 00 | 14.5 MB | ||
03-Division 01 | 520.9 KB | ||
04-Division 02 | 199.3 KB | ||
05-Division 03 | 188.4 KB | ||
06-Division 04 | 219.7 KB | ||
07-Division 06 | 226.1 KB | ||
08-Division 07 | 304.8 KB | ||
09-Division 08 | 500.4 KB | ||
10-Division 09 | 545.7 KB | ||
11-Division 10 | 210.9 KB | ||
12-Division 12 | 203.1 KB | ||
13-Division 22 | 614.2 KB | ||
14-Division 23 | 772.3 KB | ||
15-Division 26 | 1.5 MB | ||
16-Division 28 | 252.0 KB | ||
17-Division 31 | 199.1 KB | ||
18-Division 32 | 268.6 KB | ||
19-Division 33 | 227.4 KB | ||
20-Appendix | 9.2 MB |