C2014-01 Upgrade HVAC & BAS-Community Supervision Center-Farmington
The project includes replacing 3 existing condensing units along with associated DX coils. A new chiller shall be installed with associated chilled water system. New chilled water coils shall be installed in existing air handling units. The existing BAS shall be upgraded.
Addendum #1
(click to expand/collapse)
Name | Size | ||
C2014-01 Add #1 | 1.4 MB |
Addendum #2
(click to expand/collapse)
Name | Size | ||
C2014-01 Add #2 | 19.9 KB |