X2119-01 Resurface & Rehabilitate Paved Trail, Phase 1-Babler Memorial State Park
The work consists of upgrades to existing pedestrian trail. The work includes asphalt pavement repair, asphalt overlay of existing trail, widening of existing trail, storm culvert and headwall replacement. The trail improvements will be from Station 0+00 to Station 41+66 and Station 55+00 to Station 85+45. Project will be bid as a lump-sum project. Phase-1 has an Add- Alternate bid item to adjust the trail's vertical alignment and add low water crossings near Stations 29+35 and 34+00.
Specifications
(click to expand/collapse)
Name | Size | ||
01-Full Spec | 6.2 MB | ||
02-Division 00 | 4.8 MB | ||
03-Division 01 | 1.5 MB | ||
04-Division 03 | 111.8 KB | ||
05-Division 04 | 149.8 KB | ||
06-Division 31 | 46.4 KB | ||
07-Division 32 | 765.6 KB | ||
08-Division 33 | 78.7 KB |