RE-BID M2001-01 Install Fire Alarm System-Northwest Missouri Psychiatric Rehabilitation Center
The work consists of providing a complete fire-alarm system replacement of devices & panels, by swapping out existing devices & panels for new at all current locations (when applicable) & providing new devices at new locations to provide a code compliant system in the Main Facility & the six cottages. Existing wiring & conduit is intended for reuse, & is assumed in good condition by this design. New wiring will be required for relocated devices & additional devices.
Issued for Bid
(click to expand/collapse)
Name | Date | Size | ||
00-Full PDF of Plans | 9/29/2022 | 2.1 MB | ||
01-G-001_Cover Sheet | 9/29/2022 | 235.9 KB | ||
02-FA-01_General Notes, Details and Plans | 9/29/2022 | 356.9 KB | ||
03-FA-10_Fire Alarm Plan Area A | 9/29/2022 | 523.5 KB | ||
04-FA-11_Fire Alarm Plan Area B | 9/29/2022 | 450.6 KB | ||
05-FA-12_Fire Alarm Plan Area C | 9/29/2022 | 445.2 KB | ||
06-FA-13_Fire Alarm Plan Area D | 9/29/2022 | 554.7 KB | ||
07-FA-14_Fire Alarm Plan Area E | 9/29/2022 | 596.2 KB | ||
08-FA-15_Fire Alarm Plan Area F | 9/29/2022 | 572.8 KB | ||
09-FA-16_Fire Alarm Plan Area G | 9/29/2022 | 434.9 KB | ||
10-FA-20_Fire Alarm Plan Cottage 1 | 9/29/2022 | 413.6 KB | ||
11-FA-21_Fire Alarm Plan Cottage 3 | 9/29/2022 | 424.7 KB | ||
12-FA-22_Fire Alarm Plan Cottage 5 | 9/29/2022 | 424.9 KB | ||
13-FA-23_Fire Alarm Plan Cottage 7 | 9/29/2022 | 423.1 KB | ||
14-FA-24_Fire Alarm Plan Cottage 9 | 9/29/2022 | 425.1 KB | ||
15-FA-25_Fire Alarm Plan Cottage 11 | 9/29/2022 | 425.0 KB |